SUSANNE█ZOTTL
MARIO█BUDA
ABOUT
ARCHITECTURE
█PROJECTS
█RESEARCH
█TEACHING
GRAPHICDESIGN
PHOTOGRAPHY
█PROJECTS
█COMMISSIONS
MAK New Entrance: Rendering

MAK New Entrance

Barrier-free access and reorganization of the lobby, MAK – Museum für angewandte Kunst

Republic of Austria

Burghauptmannschaft Österreich

Vienna, Austria

2019-2021

█████████

design█implementation planning

█

Design Concept

The new barrier-free access is detached from the historic building and thus corresponds to the high standards of the protected object:
The surrounding pavement lifts up, transforms into a sculptural object that responds to the „Gate to the Ring“ (James Wines/SITE Architecture Art Design, 1992) and ends in a bridge that connects to an existing opening which was no longer in use.

 

The space behind this opening – a former bookstore – is re-opened to full height and houses a new elevator, that connects to the Columned Main Hall – the access to the exhibitions.

█

TEAM MARIO BUDA, Daniel Kerbler█Structural Engineering REINHARD SCHNEIDER█KE/BAUKG Maurer&Partner ZT GmbH█building services engineering Die Haustechniker Technisches Büro Gmbh█conservator Denkmalpflege GmbH█local construction supervision Arch. Gerhard Moßburger ZT GmbH

█

SUSANNEZOTTL█ARCHITEKTIN███
█MAG.ARCH.M.ARCH.██████████
███████████████████████████
█MOBIL+4369913208838███████
█Mit███████████████████████
DanielKerbler█MAG.ARCH.████

 

MAK New Entrance: Construction
construction 2020
MAK New Entrance: Before Renovation
before renovation